C e n t e r   O f   T e c h n o l o g y
Home

Home

LATES NEWS
ONGOING PROJECTS

Growth in the Number of Contracts Over the Past 5 Years

Chart of Total Collaborations Over the Last 5 Years

Growth in Contract Value Over the Past 5 Years

Chart of Total Revenue Over the Last 5 Years

Ongoing Projects

Environmental Impact Assessment (EIA) for the Pongkeru Hydroelectric Power Plant (2 × 46 MW) and Preliminary Study for the Pongkeru–Malili Transmission Line (150 kV) The Environmental Impact Assessment (AMDAL) Study for the Pongkeru Hydroelectric Power Plant (2 × 46 MW) and the Preliminary Study for the Pongkeru–Malili Transmission Line (150 kV) in Malili Regency, South Sulawesi, were conducted in collaboration with Hyundai Engineering Co., Ltd. This project was intended to identify, study, and analyze the environmental impacts resulting from the construction of the hydroelectric power plant in Pongkeru.
Breakwater Consulting Services in the Masohi and Serui TBBM Pier Areas This project was awarded through a contractor selection process involving several institutions, namely LKFT UGM, FT UNDIP, DKPU ITS, and Puslatek-CoT FT UNHAS. In this selection process, Puslatek-CoT FT UNHAS was selected as the winning bidder.
Procurement of the Detailed Engineering Design (DED) for the Land-Side Facilities of the Bira Ferry Port This project is being carried out in collaboration with the South Sulawesi Provincial Department of Transportation.

Profile COT